Project details:
Sector: Biofuel Year of execution: 2013 Location: Cáceres
Project description:
Civil works for the installation and connection to the 15 m³ tank of the equipment pre-assembled in 40′ container. The containerised equipment consists of a dissolved air flotation plus a sand filter for the treatment of algae from the solar thermal plant.