Project details:
Sector: Biofuel Year of execution: 2012 Location: Valladolid
Description of the project:
Supply, installation and assembly of a flotation equipment to treat water from a cleaning water pond, produced by the sugar factory and the reform of the existing sand and carbon filters at a flow rate of 40 m³/h.