Project details:
Sector: Waste Treatment and Valorisation Year of execution: 2017 Location: Portugal
Project description:
Reform of WWTP. Homogenisation tank of 340 m³ with Physical-Chemical treatment with Dissolved Air Flotation in pre-assembled + SBR Biological Treatment of 401 m³ to reduce the load to permissible discharge levels + Sludge storage tank.