Project details:
Sector: Organic Waste Recovery Plant Execution Year: 2024 Location: Sevilla (España)
Project Description:
Supply, assembly, and installation of two storage tanks for the digestate line. The system includes a 40 m³ GRP tank for transferring water from the flotation separator and filter press drainage, and a 1,000 m³ storage tank for digestate.