Project details:
Sector: Slaughterhouse Year of execution: 2005 Place: Valladolid
Description of the project:
WWTP rabbit slaughterhouse 100 m³/day consisting of a pre-treatment and a physical-chemical process with Dissolved Air Flotation to reduce the load to at least 60-65% and subsequent sludge dewatering.