Project details:
Sector: Food sector Year of execution: 2010 Location: Valladolid
Description of the project:
The purification process to be followed for urban water is the reduction of the load by means of a septic tank.
The treatment process to be followed for industrial water is based on pre-treatment with a sand trap and subsequent rotary sieve. The discharge will then be subjected to biological treatment using activated sludge with its corresponding decanting.